Innovate Eco-friendly building material, Create sunshine life.

UNQ

Sunshine board construction method

by:UNQ     2020-10-01
182 sunshine board construction method ( A) Construction order, measuring unreeling to install sunshine board ceiling main framework, adjustment, leveling, fixed sunshine board ceiling skeleton - adjustable pingyang board ceiling installation time frame - installation sunshine board and outer glue, layering to install inner sunshine board, glue, install the layering - sunshine board ceiling external eaves adjustment and details. ( 2) Sun plate endurance plate main construction technology of 1. Elastic line: according to drawings, elevation and sunshine board ceiling position size and has been the center of the determination of the pop-up sunshine board ceiling the main skeleton line of position. 2. Embedded parts: according to the elevation of the main skeleton line of sunshine board ceiling position, check the hole on the beam surface elevation is in line with the design requirements, if there are any differences should take chisel or with high strength grade of cement mortar leveling process, after reaching strength, according to the size of deepening the design detail drawing embedded steel bolts location line, then drilling put bolts, installation of steel plate and the fixed expansion bolt. Then the center line of the main skeleton cast to the embedded steel plate. 3. Install the frame: according to the main skeleton line of position pop-up sunshine board ceiling, after first installed on both ends of the middle section, its methods: 60 mm x 60 mm x 3 mm square steel tube ( Galvanized) After backbone assembled on the roof, with human in position online, thread hanging vertical plane, the intermediate temporary fixed after welding with embedded steel plate. On both ends of the main skeleton after ok, intermediate and 1500 mm on each side ( From steel bearings on both ends up) After three longitudinal flux lines, from one end to the other side again one by one to complete installation. 4. The installation time frame: the sunshine board ceiling main framework fixed after the completion of installation, the installation sunshine board ceiling 60 mm x 60 mm x 3 mm square steel skeleton, and alignment, leveling, and the main frame welding fixed. While sunshine board installation, moistureproof agent was laid. 5. Install outer sunshine board: according to deepen design layout position, will be ready to fit the outer sunshine board for installation of 20 mm thick, after the installation of the sunshine board, longitudinal seam, the edge of joints in a line. 6. Glue, install the layering: after fully check the outer sunshine board installation quality, and install outer sunshine board, side dozen weather resistance rubber, special aluminum alloy layering installation again. Install the layering of screw spacing, position must conform to the requirements of the drawings. 7. Install the inner sunshine board: according to the drawings, will be ready for the lining of the suitable size 16 mm thick plate sunshine for installation, the bottom of the upper plate should be installed through clear clean white towel, at the same time, the inner sunshine board allows the clear clean before the installation, in order to avoid interlayer pollution cannot be cleaned and influence macro effect. 8. Glue, install the layering: after fully check the inner sunshine board installation quality, and install the inner polycarbonate sheet, side dozen weather resistance rubber, special aluminum alloy layering installation. Layering of screw spacing, position must conform to the requirements of the drawings. 9. All the sunshine board after the installation, the sunlight board roof eaves weeks outside circle must also be the nodes in the construction according to the drawing. After the eaves all closed out ( Containing glass curtain gables) To remove the protective casing. Protective shed must be conducted in accordance with the requirements of scaffolding demolished, and finished product protection, prevent the damage to finished product. Four, sun plate endurance quality standards and quality measures. 1. This project arc steel structure production, installation quality, according to the 'standard of steel structure construction and acceptance' ( GB50205 - 96). The standard is carried out. 2. Arc square steel main frame and steel members according to classification, model, installation order to pile up, for easy access, do not overlap stacking artifacts.
Hebei Unique Plastics Manufacturer Co., Ltd is fully committed to supplying high quality products and services.
For details on custom polycarbonate sheet, see Hebei Unique Plastics Manufacturer Co., Ltd at UNQ Plastics.
[拓展名称] include a great variety of devices with a wide range of complexity: from simple custom plastic sheets used since prehistoric times to the complex of modern mechanized custom plastic sheets.
Your co-workers, investors and clients have busy schedules, and it can be hard to get everyone in the same place at the same time for custom polycarbonate sheet. So, it is important to create a connection between company and clients.
Custom message
暂无友情链接数据
Chat Online
Chat Online
Chat Online inputting...
Sign in with: